国产1 025,2 045 t/h悬吊式锅炉受热面安装过程中,前、后、左、右水冷壁上联箱安装标高普遍偏低,不符合规范要求。其原因是水冷壁上联箱悬吊梁跨长较大,这种悬吊式钢架结构锅炉,因为其受热面全部重量通过数根吊杆有序分布悬吊在炉顶钢架梁上,炉顶钢架梁在受锅炉受热面自重后会自然下垂产生一定的挠度。因此,上联箱(水冷壁)、包墙下部联箱安装标高需要一定量的预留值,以解决标高重复调整。
Domestic 1 025,2 045 t / h suspension boiler heating surface installation process, before and after the left and right water wall on the header installation level generally low, does not meet the specifications. The reason is that the suspended beam on the wall of the water-cooled wall is relatively large in cross-section. Due to the total weight of the heated surface of the suspended steel frame suspended boiler, Roof steel beam by the heating surface of the boiler will naturally sag after a certain degree of deflection. Therefore, the upper header (water wall), the lower wall of the header installation of elevation requires a certain amount of reserve value, in order to solve the repeated height adjustment.