本会同意省水利厅所拟「江西省1958年防汛计划」,特批转各地,希认真研究贯彻执行。由于我省合作化运动的迅速发展,去冬今春圩堤堵复和岁修工程已超额完成任务,进一步提高了圩堤抗洪能力,为战胜水旱灾害,保障农业增产打下了有力的基础。但是必须指出,从现在圩堤工程情况来看,还存在着一些问题,如:有些圩堤工程未严格进行清基、打夯工作;有些圩堤险段质量没有达到计划要求;有些圩堤隐患未彻底清除;部分新修圩堤尚未经过洪水考验;在干部和群众方面,则存在有麻痹松懈思想。所有这
This Council agrees with the “Department of Flood Control of Jiangxi Province in 1958” proposed by the Department of Water Resources of the People’s Republic of China and earnestly approves all localities and hopes to seriously study and implement it. Due to the rapid development of cooperation in our province, the project of overcoming and rehabilitating levees by spring and spring has surpassed the tasks and further enhanced the capacity of flood dike to fight floods, laying a solid foundation for overcoming floods and droughts and ensuring agricultural production. However, it must be pointed out that there are still some problems from the current status of the levee dike project. For example, some levee dike projects do not strictly carry out the work of clearing the base and ramming them. Some levee levee sections fail to meet the planning requirements; Some of the newly constructed levees have not yet been tested for flooding; in terms of cadres and the masses, there are some ideas of paralysis and loosening. All this