论文部分内容阅读
为了切实贯彻国家对环境保护的一系列指示精神,造福人民,减少危害,针对云浮硫铁矿在近几年由于矿山基建剥离及其它原因所造成的泥石流危害问题,于一九七六年四至六月间我院与云浮硫铁矿曾组织了现场“三结合”小组,结合矿山实地状况,本着与主体工程“同时设计、同时施工、同时投产”的要求,提出了泥石流防治的设计方案。一年多来,矿山积极地进行了有关泥石流的整治工程,基本上已抑制了矿区最严重地段泥石流的发展,塌坍山体及沟谷坡脚逐渐趋于稳定,防治工程已初见成效。
In order to effectively carry out the state’s directives on environmental protection for the benefit of the people and reduce the harm, in view of the problem of debris flow hazards caused by the divestment of mining infrastructure and other causes of Yunfu Pyrite Mine in recent years, During the month, our institute and Yunfu Pyrite Mine organized the on-site “triple combination” team to put forward the design scheme of debris flow prevention and control in accordance with the actual conditions of the mine and in line with the requirements of “simultaneous design, simultaneous construction and simultaneous operation” with the main project. In the past year or so, the mine has actively carried out renovation work on debris flows, basically inhibiting the development of debris flows in the most serious mining areas. The foot of the collapsed hills and valleys has gradually stabilized, and prevention and control work has achieved initial success.