我们尝到了按统筹计划施工的甜头

来源 :工业建筑 | 被引量 : 0次 | 上传用户:conanjunn
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
我们工段由去年九月份组织试点统筹计划进行施工,我们小组也是从这时候开始执行的。由于领导重视,兄弟工段密切配合,这阶段完成任务比以前顺利。干出来的活确实多而快,质量也不错。什么原因呢?回忆一下,一方面是大家的干劲比以前足了,另外一方面,这阶段按统筹计划指导施工,比较有条理,忙而不乱,上下心情舒畅,该干什么就干什么, Our work section was constructed from the pilot co-ordination plan organized in September last year. Our team also started this time. Due to the leadership’s attention, the siblings closely cooperated, and the completion of the task at this stage was smoother than before. The quality of the work done was really fast and the quality was good. What are the reasons? Recall that on the one hand, everyone’s energy is better than it used to be. On the other hand, this phase of the project is guided by the overall plan. It is more organized, busy but not chaotic, and comfortable, and what to do,
其他文献
请下载后查看,本文暂不支持在线获取查看简介。 Please download and view, this article does not support online access to view profile.
第三冶金建设公司职工,发扬敢“创”、敢“超”的革命精神,深入开展大创样板工程活动。目前,这一活动正在向着纵深方向发展。这个公司职工,一年来在工程质量上打了许多硬仗,
八八六厂二期工程的建设方案,是一九六四年四月确定的。经过一年来的实践,特别是以阶级斗争为纲,大抓设计革命、施工革命和企业管理革命运动以来,促进了思想革命化,进一步冲
9月份以来,包建两级公司的领导和各职能部门,组织了十三个工作组,分别到基层蹲点,贯彻武建经验。建设公司组织的三个工作组,到选烧、企业、科研蹲点以来,从发动群众、抓准备
本文借纪念抗日战争胜利50周年之际,用大量历史事实揭露批判日本军国主义侵华时所犯下的滔天罪行。同时驳斥了战后尤其是近几年来,日本军国主义残余势力歪曲历史、编造谎言,
中国经济的快速发展壮大,市场投资环境的不断完善,带动了全民创业的浪潮,各行各业的新兴公司、企业、单位都与日俱增,对办公楼的租赁和占有在不断扩大,对办公空间的需求日益
怎样对待技术革新和技术革命这个问题呢?我的回答是:必须带着无产阶级感情搞革新。我是第六冶金建设公司一处防腐队副队长,刚从新江调来时,领导上分配我做抹灰工长,当时任务
由于职业中专招生时是最后一批录取的,甚至于很多未参加中考的学生进入职专学习,这就决定了职业中专的学生入学起点低、基础差。特别是数学这门学科,学生基础更差。面对这样
我国从1955年起,开始采用电弧焊接法制造大型高炉炉壳。鞍钢九号高炉就是第一座采用焊接炉壳的高炉。炉壳制作的第一道工序是画线。当时,领导上把这项工作交给了我们小组。
去年12月中旬,建设部在南京召开了全国建筑科技工作会议。会议认为,30多年来建筑业为发展国民经济和改善人民生活作出了重要贡献。但是,建筑业的生产方式目前还比较落后,经