论文部分内容阅读
《水电站大坝安全管理暂行办法》颁发以后,全国加强了对大坝的安全监察。大坝安全管理工作步入正执。云南省电力局也成立了“大坝安全监察办公室”并积极开展工作。根据能源部大坝安全监察中心的安排,1990年至1991年进行了以礼河电厂毛家村大坝的第一次安全定期检查。毛家村土坝,坝高82.5 m,从50年代开始设计、施工,在1970年建成,在当时是全国最高的土坝。毛家村水库是以礼河梯级电站的龙头水库,为一多年
After the promulgation of the Provisional Measures on Dam Safety Management for Hydropower Stations, the dam safety monitoring was strengthened across the country. Dam safety management is in full swing. Yunnan Provincial Electric Power Bureau also set up a “dam safety supervision office” and actively carry out the work. According to the arrangements made by the Department of Energy Dam Safety Supervision Center, the first safety regular inspection of Maojiacun Dam at Lihe Power Plant was carried out from 1990 to 1991. Maojiacun earth dam, dam height 82.5 m, from the 1950s design, construction, built in 1970, was the tallest earth dam in the country. Maojiacun reservoir is the main reservoir of Li River cascade hydropower station, as a multi-year