论文部分内容阅读
近年来,面对老油田油藏地质条件复杂、开采难度大等现实情况,胜利采油厂四矿成功将油井示功图监控计量技术融入日常的油井管理之中,生产时率提高了2%以上,实现增油3000吨。这是一个像往常一样的傍晚,胜利油田胜利采油厂四矿ST3-10X162井突然发生杆断躺井。监控人员通过分析该井示功图变化示意图及时发现抽油机井停井。四矿相关负责人一个小时后到现场落实完毕,实施捞杆自扶措施,次
In recent years, faced with the complex geological conditions in the old oilfield reservoirs and the difficulty in mining, Shengli Oilfield No.4 succeeded in integrating well monitoring and metrology techniques into daily oil well management and increased the production rate by over 2% , To achieve an increase of 3,000 tons of oil. This is the same as usual in the evening, Shengli Oilfield Victory Oilfield four mine ST3-10X162 wells suddenly lie down well. Monitoring personnel through the analysis of changes in the schematic diagram of the well in time to find pumping wells stop. Relevant person in charge of the four mines to the scene after an hour to implement, the implementation of fishing rod self-help measures, times