略谈设计阶段对工程造价的控制

来源 :工程经济 | 被引量 : 0次 | 上传用户:Puzzling600
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
工程造价管理工作的重点就是要合理确立和有效控制造价,把项目投资控制在批准的造价限额内,且合理的使用人力、物力、财力,以取得最大投资效益。工程造价管理工作贯穿于整个建设的全过程,即投资决策阶段、设计阶段、招标投标阶段、施工阶段、竣工验收阶段。其中设计阶段是形成和确定工程造价的重要阶段,同时也是工程造价控制的关键阶段。如何控制设计阶段工程造价,笔者谈点个人的见解。 The focus of project cost management is to establish and effectively control the cost of construction, the project investment control approved cost limits, and the rational use of manpower, material and financial resources in order to obtain the maximum investment returns. Project cost management throughout the entire construction process, that is, investment decision-making phase, the design phase, the bidding stage, the construction phase, the completion of the acceptance phase. The design stage is to form and determine an important stage of project cost, but also the key stage of project cost control. How to control the design phase of project cost, the author talk about personal opinions.
其他文献
伪膜性结肠炎(PMC)是一种以形成突起的黄白色斑块为特征的结肠和直肠粘膜的炎性疾病。目前,PMC的病程不一,从轻微的水样腹泻到发展成为中毒性巨结肠。经典的PMC是腹部外科中
省公安厅交警总队为提高城市交通管理水平,更好地服务全省经济建设,决定在合肥、马鞍山、蚌埠、明光、桐城市和舒城、涡阳县实施“畅通工程”。目前,该工程已进入准备阶段,2月26日至
我们常常会听到一些中小学生的家长抱怨:教师要求学生听课时必须将双手背在身后,保持上体正直,因此,一天的学习结束后,孩子们十分疲倦。近年来,学生的书包越来越大,“位斗”里已容纳
现在,各界都在强调诚信的重要性,市场经济或加入WTO都需要诚信作为原则来保证经济活动的正常运转。最近央行也提出要借鉴上海经验建立一个国家级的资信机构,全面推进诚信社
金陵饭店位于华东大都市南京城的中心,设备先进,服务一流。1987年春天,我和妻子埃伦研究中国的幼儿园及小学的艺术教育问题时,我们同一岁半的儿子本杰明便下榻在那里。我们
一、发展农业教育的环境分析 (一)发展农业教育的有利因素 1.通过国情教育,依靠科技教育兴农已取得共识,并有了紧迫感 中国是一个有11亿人口的国家、农业资源相对紧缺,人均
吡喹酮(PQT)、丙硫咪唑(ABZ)治疗人体肺吸虫病的一般疗法分别为25mg/kg/次,每天3次,连用3天和8mg/kg/d连用7天。但按此疗法,ABZ对斯氏效果较好,而对卫氏欠佳。我们将两药采
本文观察了67例不同类型乙型肝炎患者肝内HbcAg 及血清HBV 复制标记、ALT、AST 的动态变化,探讨肝内HBcAg 与肝脏病变的关系。结果表明,肝内HBcAg 与血清HBV-DNA、HBeAg 有良
194名新生儿随机分为A、B、C、D四组。A、B、C组分别于出生后24h、l月龄和6月龄时于三角肌部位注射乙型肝炎免疫苗(长春生物制品研究所产,批号8611-5)10μg、5μg、2μg;D组
1992年6月23日,是国务院批转国家教委《关于改革和发展成人教育的决定》(简称《决定》)发表5周年。为此,中央教育科学研究所成人教育研究室和《教育研究》杂志社于4月22日在