论文部分内容阅读
本文介绍了锦屏一级水电站600MW水轮机筒阀的结构,详细叙述筒阀安装工艺,对筒阀安装过程中出现的问题进行总结,为后续机组安装及同类型问题的分析处理提供参考和借鉴。
This paper introduces the structure of 600MW turbine valve of Jinping I Hydropower Station. The cylinder valve installation process is described in detail. The problems occurred during the installation of the cylinder valve are summarized. It can provide reference for subsequent unit installation and analysis of the same type of problems.