论文部分内容阅读
为了满足建设单位对工期和工程造价控制的要求,提高边坡设计工作效率,缩短工期,研究边坡治理方案的选型评估有着十分重要的意义。该项研究总结分析了常见边坡结构稳定措施的适用条件,提出了边坡治理措施的初步选型原则。通过设计和资料收集工作,针对不同高度、不同地层情况边坡进行不同支挡型式分析,设计计算了625个边坡,加上收集到的39个边坡治理工程,最终获得664个边坡治理实例。该研究对664个边坡治理实例进行了经济性、施工难度、施工周期的分析对比,为边坡治理进一步选型提供了决策依据。
In order to meet the requirements of construction units for the control of construction period and project cost, it is of great significance to improve the work efficiency of slope design and shorten the construction period, and to study the selection and evaluation of slope management plan. The study summarizes the applicable conditions of common slope structure stability measures and puts forward the preliminary selection principle of slope treatment measures. Through the design and data collection work, different types of slope support for different height and different strata were analyzed, 625 slopes were designed and calculated, and 39 slopes were collected, and 664 slopes were finally managed Instance. The study analyzed and compared 664 examples of slope management with economy, construction difficulty and construction cycle, which provided the decision-making basis for further slope selection.