Real-time Design Constraints in Implementing Active Vibration Control Algorithms

来源 :International Journal of Automation and Computing | 被引量 : 0次 | 上传用户:vsbutcher00
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Although computer architectures incorporate fast processing hardware resources, high performance real-time implementation of a complex control algorithm requires an efficient design and software coding of the algorithm so as to exploit special features of the hardware and avoid associated architecture shortcomings. This paper presents an investigation into the analysis and design mechanisms that will lead to reduction in the execution time in implementing real-time control algorithms. The proposed mechanisms are exemplified by means of one algorithm, which demonstrates their applicability to real-time applications. An active vibration control (AVC) algorithm for a flexible beam system simulated using the finite difference (FD) method is considered to demonstrate the effectiveness of the proposed methods. A comparative performance evaluation of the proposed design mechanisms is presented and discussed through a set of experiments. Despite computer architectures incorporate fast processing hardware resources, high performance real-time implementation of a complex control algorithm requires an efficient design and software coding of the algorithm so as to exploit special features of the hardware and avoid associated architecture shortcomings. This paper presents an investigation into the analysis and design mechanisms that will lead to reduction in the execution time in implementing real-time control algorithms. The proposed mechanisms are may by one of the algorithms, which demonstrate their applicability to real-time applications. An active vibration control (AVC ) algorithm for a flexible beam system simulated using the finite difference (FD) method is considered to demonstrate the effectiveness of the proposed methods. A comparative performance evaluation of the proposed design mechanisms is presented and discussed through a set of experiments.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
New development trends in electronic operating data logging systems enable classification, recording and storage of load spectrums of mechanical transmission co
本刊讯:2009年11月12日由中国交通运输协会城市轨道交通专业委员会在北京·中国国际展览中心综合楼的两个会议大厅分别举办了“城市轨道交通综合监控系统研 Ben Kanxun: Nov
This paper analyses the concept of a Limit Set in Parameter Optimal Iterative Learning Control (ILC). We investigate the existence of stable and unstable parts
目前,在世界范围内将4K作为电视技术未来的发展方向,已经取得了广泛的共识。日韩、欧美的电视制造商、运营商都对4K进行了深入的研究和大量的投入,并在应用方面取得了不小的
货运飞船是空间站补给物资的重要运输工具,也是空间站的地面后勤保障系统。截至2013年3月,美国太空探索技术公司(SpaceX)的“龙”(Dragon)货运飞船两度成功执行“国际空间站
H-2转移飞行器(HTV)由日本宇宙航空研究开发机构(JAXA)负责研制,是一种向“国际空间站”(ISS)日本实验舱(JEM)运送物资为主要目的的无人货运飞船(一次性使用、不可回收)。三
2012年10月3日,欧洲航天局(ESA)的第三艘自动转移飞行器(ATV-3)—“阿马尔迪”(Amaldi)结束了其长达6.5个月的补给和服务“国际空间站”(ISS)的任务再入地球大气层。2013年4