灵川铁合金厂原有二座100m~3高炉(3号和4号)是炼普通生铁的,1980年后改炼锰铁,年产能力约3万吨。1985年开始对该二座高炉及其附属设备陆续进行了大修和系统性改造,先后分别于1986年4月和10月投产,并显示了良好的技术经济效果。单炉日产锰铁达60t以上,比原来提高了12%,实物入炉焦比由2000kg降到了1600~1800kg。入炉风温提高到1000℃以上。现将大修改造的主要措施介绍加下: 1.根据锰矿冶炼要求合理改造高炉内
The original two 100m ~ 3 blast furnaces (No.3 and No.4) of Lingchuan Ferroalloy Factory are ordinary pig iron. After 1980, ferromanganese is reformed and the annual capacity is about 30,000 tons. In 1985, the two blast furnaces and their ancillary equipment were successively overhauled and systematically rebuilt. They were put into operation in April and October 1986 respectively and showed good technical and economic results. A single furnace Nissan Manganese Iron 60t above, increased by 12% than the original, in-kind into the coke ratio from 2000kg down to 1600 ~ 1800kg. Into the furnace temperature increased to above 1000 ℃. Now overhaul the introduction of the main measures introduced plus: 1. According to the requirements of manganese smelting reasonable transformation of the blast furnace