一、“六·五”计划执行情况及其特点我省“六·五”期间(1981—85年)的水利建设,坚持贯彻国民经济“调整、改革、整顿、提高”的方针和赵紫阳总理提出的“加强经营管理,讲究经济效益”的水利工作方针,进一步转移到以提高经济效益为中心的轨道,走以内涵为主的路子。在巩固提高现有工程的基础上,进一步扩大效益。“六·五”期间共完成基建投资2.3亿元,投资规模大大低于“五·五”期间的7.4亿元。在投资减小的情况下,各地继续坚持搞水利,连同农田水利工程,全省共完成土方33亿立方米,完成小型配套建筑物2 7.5万座,保持了一
I. Implementation of the Sixth Five-Year Plan and Its Characteristics The water conservancy construction in our province during the “June-May” period (1981-85) persisted in carrying out the national economy and “readjusting, reforming, rectifying and improving” And the principle of water conservancy work put forward by Premier Zhao Ziyang to “strengthen management and pay attention to economic benefits” and further shift to the principle of improving economic efficiency as the center and take the connotation as the main approach. On the basis of consolidating and improving existing projects, we will further expand our efficiency. During the “June 5” period, a total of 230 million yuan was invested in infrastructure construction, with the investment scale significantly lower than 740 million yuan during the “May 5” period. In the case of reduced investment, all localities continued to engage in water conservancy projects. Together with farmland water conservancy projects, the province completed a total of 3.3 billion cubic meters of earthwork and completed a total of 27,500 small-sized supporting buildings, maintaining a