新乡地区小水电站装机已达47000千瓦,过去由于多种原因,这些小水电站的设备利用率普遍比较低,平均年利用小时数不到1200小时.为了挖掘小水电站的潜力,提高其经济效益,各水电站分别采取了以下一些措施.(一)增辟水源加强发电用水管理辉县黄水公社韩口大队水电站,是利用山泉发电.原先,泉水最枯流量只有0.1米~3/秒,后来挖大了山泉,枯水流量增加到0.2米~3/秒,电站出力增加一倍.潭头水电站,水头287米,近几年开展了节约“一升水”活动,每年增加发电量2%,具体办法是:
In Xinxiang, the installed capacity of small hydropower stations has reached 47,000 kilowatts. In the past, due to various reasons, the utilization rates of these small hydropower plants were generally low, with an average annual utilization hours of less than 1,200 hours. In order to tap the potential of small hydropower stations and increase their economic benefits, Hydropower stations have taken the following measures respectively: (1) Increasing water supply and strengthening power generation water management Hydropower station of Huokou Brigade of Huixian Yellow River Hydropower Station uses the spring power to generate electricity. Originally, the wastage of the spring water was only 0.1m ~ 3 / s, Spring, the flow of dry water increased to 0.2 m ~ 3 / s, power plant output doubled.Tantou Hydropower Station, 287 meters head, in recent years to carry out the “saving a liter of water” activities, an increase of 2% The specific method is: