在以往的施工组织设计中,设计者往往根据自己的经验来确定施工机械的备用量。尽管参照工程施工实践的统计资料,但确定时难免有主观随意性,缺乏确切的数学解答。同时,机修厂规模与选用的施工机械数量是否相适应,也往往未作过细地研究,从而可能导致施工机械和维修设备闲置,造成浪费。本文根据生产系统的实际情况,从多变量的非线性规划及排队论的基本原理出发,用严格的数学理论,使施工机械的最优备用率得到准确的数字解答;同时还对机械备用的选优提出了简化的计算方法。
In the past, the design of construction organization, designers often based on their own experience to determine the construction machinery spare capacity. Although it refers to the statistical data of construction practice, it is inevitable to determine the subjective randomness, the lack of an accurate mathematical solution. At the same time, the size of the mechanic factory and the number of construction machinery used are not compatible, often not studied carefully, which may lead to idle construction machinery and maintenance equipment, resulting in waste. According to the actual situation of production system, starting from the multivariable nonlinear programming and the basic principle of queuing theory, using rigorous mathematical theory, the optimum spare rate of construction machinery can be accurately solved by numbers. At the same time, Excellent proposed a simplified method of calculation.