论文部分内容阅读
主要介绍维柳伊3号水电站施工的基本情况。指出了,所采用的装配式钢筋混凝土结构的优点;闸墩头部等建筑物曲面用钢木模板的效益。另简要介绍该电站施工过程中,首次解决了受自然条件限制的复杂的施工技术问题。
Mainly introduces the basic situation of the construction of the Viliuai 3 hydropower station. It is pointed out that the advantages of the fabricated reinforced concrete structure adopted and the benefits of the steel and wood formwork for the surface of the pier and other buildings. Another brief introduction of the construction process of the power station, for the first time to solve the complex construction technology subject to natural conditions.