论文部分内容阅读
1 监理过程1.1 工程质量控制施工阶段是工程质量形成的主要阶段,该阶段的质量控制工作直接关系到工程质量能否达到设计标准,为此,监理部首先明确了该工程的质量控制依据,组织监理人员熟悉图纸、工程内容及有关规范,敦促承包商建立和健全质量保证体系,检查并完善其质量检验手段。为把质量缺陷消灭在萌芽状态,对施工作业面实施全天候旁站监理,发现违规行为及时纠正。1.1.1 联坝填筑——水中倒土。水中倒土是黄河上经常采用的水中筑坝方法,适用于水深不大,流速较小的条件。此施工技
1 supervision process 1.1 Project Quality Control Construction phase is the main stage of the formation of project quality, quality control work at this stage is directly related to the quality of the project can meet the design standards, therefore, the supervision department first clear the project quality control basis, the organization Supervisors familiar with the drawings, project content and related specifications, urged contractors to establish and improve the quality assurance system, check and improve its quality inspection methods. In order to eliminate the quality defects in the bud, the implementation of construction operations around the clock station supervision, found violations in a timely manner to correct. 1.1.1 dams fill - water down soil. Water overturning is often used in the Yellow River water dam construction methods, suitable for water depth is small, the flow rate of smaller conditions. This construction technology