渔子溪二级电站是我省目前正在施工的引水式电站之一。为了加快该电站建设,省水电工程学会施工专业委员会,对控制该电站工期的引水隧洞工程的施工方法、技术措施及机械设备等问题曾组织过学术讨论。鉴于我省水工隧洞在以往施工中不同程度地存在着通风时间长、洞内空气污浊等问题(见表1),况且渔子溪二级电站引水隧洞又长达7611.3米,其独头
Yuzi River Hydropower Station II is currently under construction in our province one of the diversion-type power station. In order to speed up the construction of the power station, the Provincial Hydropower Engineering Construction Committee has organized academic discussions on the construction methods, technical measures and mechanical equipment of the diversion tunnel that control the construction period of the power station. In view of the construction of the province’s hydraulic tunnel in the past there are varying degrees of ventilation for a long time, the air inside the hole dirty and so on (see Table 1) Moreover, the Yuzi Creek II hydropower diversion tunnel and up to 7611.3 meters long, its only