论文部分内容阅读
廊坊市经济技术开发区第二供热站有两所锅炉房,1号锅炉房有4台20t/h蒸汽锅炉,2号锅炉房有2台10t/h蒸汽锅炉。主要用于供暖、生产用汽和生活用水,每年生产蒸汽保持在50万t~70万t之间。在开展锅炉房节能管理达标活动中。该供热站采取以下几个方面技术措施:1)在炉膛两侧加装功能砖,采用功能材料浇注前后拱。提高炉膛温度,使煤得到进一步燃烧,降低了固体不完全燃烧热损失和气体不完全燃烧热损失。2)采用全自动化燃烧系统(PRC系统)。把原来的手工燃烧改为自动化。将旧式风机、水泵改成变频式风机、水泵,当锅炉负荷变动时,可以自动调整风机、水泵的功率。3)采用“O排污”技术。对锅炉炉水品质进行实时监测,根据锅炉炉水的品质将锅炉表面连续排
The second heating station of Langfang Economic and Technological Development Zone has two boiler rooms, No. 1 boiler room has 4 20t / h steam boilers and No. 2 boiler room has 2 sets of 10t / h steam boilers. Mainly used for heating, steam production and domestic water, annual steam production maintained at 500,000 t ~ 700,000 t between. In carrying out energy-saving boiler room management activities. The heating station to take the following aspects of technical measures: 1) installation of functional brick on both sides of the furnace, the use of functional materials before and after the arch pouring. Raise the temperature of the furnace, make the coal get further combustion, reduce the heat loss of the incomplete combustion and the incomplete combustion of the gas. 2) The use of fully automated combustion system (PRC system). Turn the original manual combustion into automation. The old fan, pump into a variable frequency fan, water pump, when the boiler load changes, you can automatically adjust the fan, pump power. 3) Adopt “O blowdown ” technology. Boiler water quality of real-time monitoring, according to the quality of boiler water boilers will be a continuous row of surface