建国三十多年来,我国电力建设事业经历了几个阶段的考验,正蓬勃发展。尤其是当前火电站建设,其单机容量越来越大,从200MW、300MW 发展到600MW,甚至800MW,而且建设周期要求越来越短,这给我国电力建设部门提出了越来越高的要求。许多电力建设部门由于施工设备陈旧,已很难满足这一发展的需要。虽然经过科研设计单位及修造企业的努力,已研制出适合我国
Over the past 30 years since the founding of the People’s Republic of China, the power construction in our country has undergone several stages of tests and is booming. In particular, the current power plant construction, the stand-alone capacity of more and more large, from 200MW, 300MW to 600MW, or even 800MW, and shorter and shorter construction cycle requirements, which put forward higher and higher requirements for China’s electric power construction sector. Many power construction departments have difficulty in meeting the needs of this development due to outdated construction equipment. Although after scientific research and design institutes and building enterprises efforts have been developed for our country