论文部分内容阅读
古交矿区是国家重点建设项目,总规模为年产16.5Mt,1978年开工建设,预计1992年基本建成。本文对建设较快的六个基本因素,逐个进行了剖析研究。
Gujiao mining area is a national key construction project, with a total annual scale of 16.5Mt, started construction in 1978 and is expected to be basically completed in 1992. This article analyzes the six basic factors of rapid construction one by one.