论文部分内容阅读
近几年在讨论云南电力发展规划时,听到人们议论较多的问题是如何搞好在建和新建的水、火电工程,这是应该的。然而在抓紧新增电源建设的同时,对如何发挥已建电站的效益也是不能忽视的。以下就如何发挥洱海的多年调节效益,谈几点个人粗浅的看法。洱海是云南高原第二大天然湖泊,位于滇西大理白族自治州境内。其流域面积为2513平方公里,水面积约250平方公里,平均水深11米,最大水深20余米。建设西洱河电站时,设计部门通过广泛征求地方意见和大量的计算,确定洱海正常蓄水位为1973.50
In recent years when discussing the plan of Yunnan power development, it is deserved to hear how people are discussing more about how to do well in the construction of new water and thermal power projects under construction. However, pay close attention to new power construction at the same time, how to play to the effectiveness of the already built power station can not be ignored. The following on how to play Erhai years of regulatory benefits, talk a few personal superficial view. Erhai Lake is the second largest natural lake in the Yunnan Plateau, located in Dali Bai Autonomous Prefecture in western Yunnan. The basin area of 2513 square kilometers, the water area of about 250 square kilometers, the average depth of 11 meters, the maximum depth of 20 meters. When building Xierhe Hydropower Station, the design department through extensive solicitation of local opinions and a large number of calculations to determine the normal water level in Erhai Lake was 1973.50