水泥混凝土路面到达其使用年限,或者其他原因破坏,需要重建时,现在的一般做法是挖除并废弃旧的水泥混凝土面层,修补基层后,重新进行铺筑。破除的旧混凝土往往作为建筑垃圾被丢弃,这样就引发了许多问题,如废料丢弃带来的问题;新建道路所需材料的开采带来的环境问题;以及运输和处理废料带来巨大的经济浪费,粗集料的开采和运输带来巨大的人力和物力浪费,导致总体经济效益和社会效益下降等等。
Cement concrete pavement to reach its useful life, or other causes of damage, the need to rebuild, the current practice is to dig and discard the old cement concrete surface layer, repair the grassroots level, to re-paving. Old concrete that has been dismantled is often discarded as construction waste, causing many problems such as those caused by waste disposal; environmental problems caused by the mining of materials required for the new roads; and huge economic waste from the transport and disposal of waste , Coarse aggregate mining and transportation brought huge human and material waste, leading to the overall economic and social benefits decline and so on.