论文部分内容阅读
推行快速炼钢必须要吸取苏联以及各兄弟厂的先进经验;并总结我车间各班各炉的先进操作方法,加以综合进行试验和推亡,为了集中力量在某方面先累积一些经验,我们曾对补炉与进料阶段进行了一些试验工作。 (一)炉料堆放地点的安排和平车的调节在目前大部分班和炉子对于炉料的放堆地点的安排是不够合理的,常常把废钢堆在炉子周围的空地上,满地皆是,杂乱无章,这样在进料时一方面要从很远的地方去搬运废钢,加重了操作同志的劳动强度,另一方面也因此拖长了整个进料时间。对于平车的调节亦是很不合理的,往往在烧料后该再进料时平车还没有及时推上平台,如果因此而延长烧料时间来等料,势必造成炉料烧化,冷料加入时形成结壳现
The implementation of rapid steelmaking must draw on the advanced experience of the Soviet Union and the brothers and sisters. It also summarizes the advanced operation methods of furnaces in various workshops in our workshop and carries out experiments and tests in a comprehensive manner. In order to concentrate on accumulating some experience in some aspects, Filling furnace and feeding stage of some of the experimental work. (A) the placement of the charge material peace car adjustment Most classes and furnaces at the current placement of charge for the site is not reasonable enough, and often the scrap heap in the open area around the stove, everywhere, chaotic, In the process of feeding, on the one hand, scrap steel is to be transported from a great distance, which increases the labor intensity of the operating comrades and, on the other hand, prolongs the entire feeding time. The adjustment of the flat car is also very unreasonable, often after the refueling when the flat car has not yet promptly pushed the platform, so if prolonged burning time to wait for the material, is bound to result in burned charge, cold material to join When the formation of crust is