2008年,核燃料后处理放化实验设施(CRARL)工程从施工准备转入正式建造阶段,工程于3月破土负挖,5月按期取得建造许可证,浇筑第1罐混凝土。完成了D座(甲级放化实验楼)地
In 2008, CRARL was transferred from construction preparation to the official construction phase. The project was ground-broken and dug in March and a construction permit was obtained on schedule in May for pouring the first tank of concrete. Completed Block D (Grade A radiochemical laboratory building)