论文部分内容阅读
一、工程概况前方栈桥共安装10条皮带机:4条提升皮带机,3条计量皮带机(未装电子称)与3条装船皮带机。它们分为三个系统:1是J_1—C_1→M_1;2是J_(2-2)→J_(2-1)→C_2→M_2;3是J_(3-2)→J_(3-1)→M_3。(见附图) 除3条计量皮带机的传送带为16毫米厚的普通胶带外,其余均为厚22毫米、抗拉极限为1600公斤/厘米~2的钢绳芯高度强度胶带。皮带宽度均为1.4米,带速为3.45米/秒,每小时输煤能力2500吨,是我国目前国产同类机械中生产效率最高的。
First, the project overview Trestle a total of 10 front-mounted belt conveyor: 4 to enhance the belt machine, belt conveyor 3 (without electronic) and 3 loading belt machine. They are divided into three systems: 1 is J_1-C_1 → M_1; 2 is J_ (2-2) → J_ (2-1) → C_2 → M_2; 3 is J_ (3-2) → J_ (3-1) → M_3. (See the attached drawing.) The belt except for the three belt conveyors is a 16 mm thick common tape, the other is a 22 mm thick steel cord with a tensile strength of 1600 kg / cm². Belt width is 1.4 meters, with a speed of 3.45 m / s, coal handling capacity of 2,500 tons per hour, is China’s current domestic production of similar machinery in the highest efficiency.