论文部分内容阅读
黑山峡河段2个开发方式的勘测设计工作进行了50多年,二级开发小观音枢纽布置设计以混凝土双曲拱坝为推荐方案,二级开发大柳树低坝枢纽布置设计以混凝土重力坝坝后厂房为推荐方案。
The exploration and design work of 2 development modes of Heishan Gorge section has been carried on for more than 50 years. The layout design of Xiaoguanyin project of secondary development is based on the proposal of concrete double curvature arch dam. The secondary development of Daliushu low dam layout design is based on concrete gravity dam After the workshop for the recommended program.