论文部分内容阅读
74年12月~75年7月期间我院港机系、动力系部分师生与天津港务局技术人员共同设计了一台港口装卸用200吨/50吨新型浮吊。这台大型浮吊于1978年12月底胜利建成并于今年4月通过技术鉴定后正式投产。200吨/50吨新型浮吊的建成投产为我国港口现代化作出了贡献。下面介绍港口新型浮吊的主要特点、性能参数和各主要部分的结构特点。
From December 74 to July 75, some teachers and students of the Department of Mechanical Engineering and Power Engineering Department of Tianjin University and Tianjin Port Authority jointly designed a 200-ton / 50-ton new type of floating crane for port handling. This large floating crane was successfully completed at the end of December 1978 and formally put into operation after passing the technical appraisal in April this year. 200 tons / 50 tons of new floating crane put into operation for the modernization of China’s port has made its contribution. The following describes the main features of the new floating crane in the port, the performance parameters and the structural features of the main parts.