主要介绍了神木北站进行万吨扩能改造方案的实施过程,经反复论证并根据现场调研情况,将原先的50 d封锁施工方案优化为最终的31 d分三步封锁施工方案,实施后,取得了预期效果。
This paper mainly introduces the implementation process of Shenmu North Station expansion project. After repeated demonstration and based on the field investigation, the original 50-day blockade construction program was optimized into the final 31-day blockade construction program. After the implementation, Achieved the desired effect.