论文部分内容阅读
蕴东水利枢纽包括一座节制闸和一座船闸,是上海通向太湖流域江、浙两省的航运咽喉和嘉宝北片重要的排涝口门,对地区经济的发展具有举足轻重的作用。该工程经安全检测后,需要对部分建筑物采取除险加固措施,包括裂缝及破损部位的修补、船闸闸室加固、导流堤修复、导航墩拆除重建、内河翼墙修复、闸门水封更换以及电气设备完善等,并通过数学模型推求外河导流堤需延伸的长度。蕴东枢纽未来有改建可能,继续使用的年限不会太长,因此本次除险加固本着节省投资的原则,通过大量的计算,对各项加固措施进行了论证。
The Yun Dong hydroproject, including a control gate and a lock, is an important drainage port for the shipping throat and Jiabao Beipiao of Shanghai leading to Jiangsu and Zhejiang provinces in the Taihu Lake Basin, and plays an important role in the development of regional economy. The project after the safety test, the need for some buildings to take measures to reinforce the dangers, including the repair of cracks and damaged parts, ship lock chamber reinforcement, dyke repair, navigation pier demolition and reconstruction, river wing repair, gate seal replacement As well as the improvement of electrical equipment, etc., and through the mathematical model to infer the length of the embankment extension of the river. In the future, the Yun-Dong Hub may have been rebuilt, and the period of continued use will not be too long. Therefore, based on the principle of saving investment, this reinforcement project demonstrates various reinforcement measures through a large number of calculations.