论文部分内容阅读
上海港宝钢全天候成品码头工程中按照设计要求在引桥近岸区域进行灌注桩施工,近岸区域为防汛大堤部分,灌注桩施工将穿过防汛大堤护坡结构,因此地质条件比一般情况下来得复杂,在施工过程中遇到一些困难,通过调整施工工艺之后才解决问题,保证了灌注桩的顺利施工。
Shanghai Baosteel all-weather terminal project in accordance with the design requirements in the approach bridge near the shore area of the bored pile construction, near-shore area for flood control levee part of the construction of bored pile will pass through flood control dike slope protection structure, so the geological conditions are more complicated than usual, Encountered some difficulties in the construction process, by adjusting the construction process to solve the problem, to ensure the smooth construction of the pile.