论文部分内容阅读
前言在我国民用建筑中,象民族饭店这样的高层装配式框架结构还是首次采用。我们虽然参考了一些资料并且初步学习了苏联在这方面的先进经验,但是对于许多具体问题还是陌生的。为了保证工程质量,并为了给将来逐步推行这种工业化施工的先进技术积累经验,以便促使建筑事业的质量和速度进一步提高。我们共同协作在建工局和第四建筑公司的密切配合下,结合设计和施工,首先对构件组合进行了试装配的荷载试验,想通过这个试验来检验各种构件在使用情况下的稳定性及梁柱节点的焊接情
Foreword In China’s civil construction, high-rise assembly frame structures such as the National Hotel were adopted for the first time. Although we have made reference to some materials and have initially learned about the advanced experience of the Soviet Union in this area, we are still unfamiliar with many specific issues. In order to ensure the quality of the project and to accumulate experience for the progressive implementation of this advanced technology for industrialization in the future, the quality and speed of the construction business will be further enhanced. We worked together in close cooperation with the Construction Industry Bureau and the Fourth Construction Company, combined the design and construction, first carried out a load test of the assembly of the component assembly, and wanted to test the stability of various components under the conditions of use through this test. And beam pillar welding