论文部分内容阅读
1.建窖:窖为东西向。挖宽一点三至二米,深零点三至零点五米,长十米的窖坑,四周打零点五米高、零点二米厚的土墙。窖底中央东西向挖深和宽各零点三米的通风沟,两头通到墙外,通风沟上架小木棍和铺稻草。窖底平铺十厘米厚的湿土。窖内南北墙每隔一点三米挖一个通风孔。2.入窖:大雪至冬至芹菜开始收获,防止嫩茎
1. Built pit: Pit for the east-west. Digging a little bit wide three to two meters, deep zero point three to zero five meters, ten meters long cellar pit, surrounded by playing zero five meters high, zero two meters thick wall. At the bottom of the cellar, the ventilation ditch with a width of 0.3 meters and a depth of 0.3 to 1.2 meters deep is drilled to the outside of the wall. The ventilation ditch shelves small sticks and straw bales. At the bottom of the pit is ten centimeters thick wet soil. Cellar north and south walls dig a hole every three meters. 2. into the cellar: heavy snow until winter celery began to harvest, to prevent tender stems