(一)装机容量影响三峡水电站装机容量的因素很多,牵涉的面很广,在充分考虑各种因素;进行全面、深入研究之后,才可能决定出最恰当的装机容量。初设要点中提出的装机容量(初期2,200万瓩,远期3,780万瓩),我们认为这个数字偏大了。普遍认为三峡装机在2,500万瓩左右较为适宜(初期1,800~2,000万瓩,远期约2,500万瓩),也有个别认为装机到2,500万瓩以上,平均利用小时数还
(A) Installed Capacity There are many factors influencing the installed capacity of the Three Gorges Hydropower Station, involving a wide range of factors, taking full account of various factors; it is possible to determine the most appropriate installed capacity after thorough and thorough research. The installed capacity (initially 22 million 瓩, forward 37.8 million 瓩) proposed in the preliminary points is, we think, this figure is too large. It is generally accepted that the installed capacity of the Three Gorges Project is around 25 million ((initially 1,800 to 20 million 瓩 and forwards about 25 million 远), and some are thought to have installed more than 25 million,. The average utilization hours