论文部分内容阅读
经过十年奋战,一座高178m的拱坝屹立在黄河之巅,巨大的水轮发电机组昼夜轰鸣,宏伟的龙羊峡水电站即将发电了。龙羊峡不仅地处西北高寒和强烈地震区,而且地形地质条件十分复杂,坝址区被8条大断裂和软弱带所切割,水库内有上亿m~3的巨大滑坡,在建设过程中遭到了200年一遇洪水的袭击,其艰难困苦难以备述。然而在龙羊峡人的奋力拼搏下,采用了大量先进技术,涌现了无数动人事
After ten years of hard work, an arch dam of 178m in height stood at the top of the Yellow River. The enormous hydro-generating units roar day and night, and the magnificent Longyangxia Hydropower Station is about to generate electricity. Longyangxia is not only located in the alpine and strong earthquake area in northwestern China, but also has complicated terrain and geological conditions. The dam site is cut by eight major faults and weak zones. There are huge landslides of over 100 million m ~ 3 in the reservoir. During the construction After being hit by a flood of 200 years, its hardship and suffering are hard to explain. However, in Longyangxia people’s hard work, using a large number of advanced technology, there have been numerous moving things