我厂为了满足生产不断发展、汽电不足的需要,新装一台 SHS20—25/400次中压锅炉,更换原有的特加成10-13型旧锅炉;新装 Bl-24/3汽轮机 TQT1000-4汽轮发电机组一台,更换原有2台375HP 蒸汽机发电机组,利用余热发电。1979年11月底投入生产,运行良好,在满足生产用电所需的情况下,还有400千瓦以上的发电潜力,可供输入电网。变买外电为供外电,并为将来提高生产能力,准备了动力条件。在安装锅炉的过程中,我们吸取兄弟厂的
I plant in order to meet the continuous development of production, the lack of gas needs of a newly installed one SHS20-25 / 400 times the pressure boiler, replacing the original Special Addition of 10-13 old boiler; newly installed Bl-24/3 turbine TQT1000- 4 turbo-generator sets, replacing the original two sets of 375HP steam engine generator sets, the use of waste heat power generation. It was put into production by the end of November 1979 and it is operating well. There is still more than 400 kilowatts of generating potential to meet the needs of production electricity for power grid input. Foreign exchange for the purchase of foreign electricity, and for the future to increase production capacity, prepared a dynamic condition. In the process of installing the boiler, we draw brothers plant