论文部分内容阅读
近十多年来东北地区设计了一些具有日调节性能的大、中型水电站。有的早已投入运行,有的正在建设,有的即将施工,今后还有一些日调节水电站待设计中。在日调节水电站水能计算中,由于有些参数缺乏明确的规定及缺少必要的日平均水文资料,所以,多数设计都是结合本工程的特点,具体分析来处理各种问题。笔者认为
In the past ten years, some large and medium-sized hydropower stations with daily regulating performance have been designed in northeast China. Some have already been put into operation, some are under construction, and some are about to be constructed. In the future there will be some days to adjust the hydropower station to be designed. In the regulation of hydropower stations in Japan, due to the lack of explicit provisions on some parameters and the lack of necessary daily average hydrological data, most designs combine the characteristics of this project with specific analysis to deal with various problems. the author thinks