论文部分内容阅读
1989年2~3月,珠江流域综合利用规划审查委员会组织了对珠江流域的现场查勘和调查研究。查勘工作由“两广组”和“云贵组””分别进行。“两广组”由水利水电规划设计院副总工程师陈清濂带队,珠委副主任周甘霖、薛建枫等22人参加,对广西、广东境内的重点规划项目及近期工程规划安排如百色、蓑衣滩、大藤峡、马骝滩、长洲、龙湾、飞来峡等规划坝址,进行了重
From February to March 1989, the Pearl River Basin Comprehensive Utilization Planning Review Committee organized on-site survey and investigation of the Pearl River Basin. The survey was led by “Guangdong and Guangxi groups” and “Yunnan-Guizhou group.” “Guangdong and Guangxi groups” led by Chen Qingtao, deputy chief engineer of the Planning and Design Institute for Water Resources and Hydropower, and 22 members including Zhou Ganlin and Xue Jianfeng, Major domestic planning projects and recent engineering planning arrangements such as Baise, Yingyi Beach, Big Teng Gorge, Ma Wan Beach, Cheung Chau, Long Bay, Feilaixia and other planned dam sites were heavily weighted