论文部分内容阅读
胶管北京朝阳公园北部园区工程施工中,需要把莲花湖的水分别调到北湖和南湖。调水量总计约80万m3。常规调水方法多用潜水泵抽,由于湖底呈锅底状,表面又坑洼不平,随着湖水不断被吸走,湖面逐渐缩小,需要不断移动水泵的位置。水泵的重量大,再加上拖着长长的胶管,在泥水里移动很是
Hose Beijing Chaoyang Park north of the park construction, the need to transfer the water of Lake Lotus, respectively, to the North Lake and South Lake. The total amount of water transfer is about 800,000 m3. Conventional water diversion method used submersible pump pumping, because the bottom of the lake was pot-shaped surface and potholes unequal, as the lake is being sucked away, the lake gradually reduced, the need to constantly move the location of the pump. The weight of the pump, coupled with the long hose dragged in the mud is very mobile