一、前言我矿是在原小窑基础上,简易投产的,无矿井设计,井巷工程布局较乱,虽经一系列的技术改造,年产量达到30万吨,但由于邻近河流、水库,加之地面建筑物分散,以上共压煤600余万吨,随着国民经济的发展,煤炭产量远不能满足需要,因而有计划地解放水下及建筑物下煤炭资源,对挖掘矿井生产潜力,延长矿井寿命,充分开采和利用地下资源和扭转过去由于“四人帮”的破坏造成采掘失调现象,有一定现实意义。而在老巷较多地区(巷道总长1310m,面积为3930m~2)及河沟下面搞条采,能否达到良好
I. INTRODUCTION Mine is based on the original kiln and is easy to put into production. There is no mine design and layout of mine shaft is chaotic. Though a series of technological transformations, the annual output reaches 300,000 tons. However, due to the proximity of rivers and reservoirs, As the country's economy develops, the output of coal is far from meeting the needs. Therefore, the coal resources under water and buildings are liberated in a planned way, and the potential for mining the productive potential of the mine is prolonged to extend the capacity of the mine Life expectancy, fully exploiting and utilizing underground resources and reversing the imbalance in the digging caused by the “gang of four” in the past are of some realistic significance. In the more old lanes (total length of the tunnel 1310m, an area of 3930m ~ 2) and under the trench engage in mining, can achieve good