××河大桥是成昆铁路线上第一座建成的栓焊梁桥,全长203.4米,两端均与隧道相连,轨底至河底高差70余米。由于桥高,地质复杂,需采用大跨度梁通过,而栓焊梁在制造、施工、养护等方面均较铆接梁为优,故确定在此桥上采用栓焊梁,中孔跨度112米,并设计为系杆拱形式,材料为16锰钢(照片1)。由于采用了新结构、新工艺、新材料,较同跨度的三号钢铆接梁减轻了重量百分之三十,收到了显著的经济效果,至今己通车近8年。1973年经昆明、郑州铁路局等单位进行检定,证明他用情况良好。现将112米系杆拱简述如下。
×× River Bridge is the first completed Chengdu-Kunming railway line welded girder bridge, a total length of 203.4 meters, both ends of the tunnel are connected to the bottom of the foot to the river elevation of 70 meters. Due to the high bridge height and complicated geological conditions, large-span beams are required to pass through. However, the welded beam is superior to the riveted beams in terms of manufacture, construction and maintenance. Therefore, It is designed as a tiered arch and is made of 16 manganese steel (photo 1). As a result of the new structure, new technology, new materials, compared with the same span of steel riveting beams to reduce the weight of 30 percent, received a significant economic effect, has been opened to traffic nearly 8 years. In 1973 by Kunming, Zhengzhou Railway Bureau and other units for testing, to prove that he was in good condition. Now 112 meters tied arch briefly as follows.