大孤山铁矿的60R牙轮钻机,用完随机带来的310毫米钻头后改用国产250毫米钻头。其排渣孔在穿孔工作中显得较小,风压升高,安全阀经常跳动,影响钻孔的正常排渣和钻孔速度。有的钻头由于设计和加工制作上的问题,对接的排渣孔多数是错位的,变成扁孔,减小了有效孔径。因此现场司机就将排渣孔自行扩大(用电、气焊割),有的扩一个,两个,有的扩三个,大小不一,随心所欲。用这样的方法来维持穿孔作业已几年了,经济效果如何?无人过问。
Dagushan Iron Ore 60R cone drill, ran out of 310 mm drill used instead of domestic 250 mm drill. The slag hole in the perforation work appears to be smaller, the wind pressure increases, the safety valve often beating, affecting the drilling of the normal slag and drilling speed. Some drill bit due to the design and manufacture of the production problems, the majority of dock slagging holes are dislocated, into a flat hole, reducing the effective aperture. Therefore, the driver of the site will expand its own slag hole (electricity, gas welding cutting), and some expansion of one, two, and some expanded three, different sizes, arbitrary. How to maintain perforation in this way for several years?