论文部分内容阅读
以铁川桥水电站工程建设情况为例,分析地质勘察工作对整个工程建设的重要性,提出在水电工程建设过程中一定要把工程地质条件和具体工程的建设要求两个方面紧密的联系起来,有针对性的开展工程地质工作,切不可在未查清建设场区的工程地质条件或对工程地质问题分析、评价不充分的情况下进行工程建设活动,以免造成不良影响或严重后果。
Taking the construction of Tiechuanqiao Hydropower Station as an example, the importance of geological survey work to the whole project construction is analyzed. It is suggested that the construction geological conditions of hydropower project must be closely linked with the construction requirements of specific projects. Targeted conduct of engineering geology work must not fail to identify the construction site of the engineering geological conditions or engineering geological problems analysis, evaluation of the case of inadequate construction activities, so as to avoid adverse effects or serious consequences.