论文部分内容阅读
目前高墩施工方案基本有翻模法、爬模法及滑模法,根据不同施工技术的适用性、经济性对项目的影响来选择施工方案。结合工程实例,介绍了山区薄壁空心高墩施工时质量控制的技术措施以及对高墩施工中可能出现的质量缺陷、通病进行分析并提出解决办法。
At present, high pier construction program basically turn over the mold, climbing mode and sliding mode, according to different applicability of construction technology, economic impact on the project to select the construction program. Combined with engineering examples, the paper introduced the technical measures of quality control in the construction of thin-walled hollow high pier in mountainous area, as well as the possible quality defects and common problems in high pier construction and the solutions to the problems.