一为了防止水患,发展水利,今年全国在一九五○年工作的基础上,已经进行了更为巨大的水利工程。計划土工总量为三億二千五百八十四万立方公尺,并有规模较大的现代化工程。部分河流的治理,已经转入治本的方向,主要河流的堤防護險工程,均较一九五○年更为加强。其他一般河流亦均有重点地进行了加强或歲修工程。不过由于国民党反动统治时期水利事业长期的停滞和破坏,我們在
In order to prevent flooding and develop water conservancy, this year the country has made even greater efforts in water conservancy projects based on its work in 1950. The total planned geotechnical volume is 352.8 million cubic meters and there is a large-scale modernization project. The management of some rivers has shifted to the direction of permanent cure. The dikes and protection projects of major rivers have been strengthened more than in 1950. Other general rivers also carried out intensive or annual repair works. However, due to the long-term stagnation and destruction of the water conservancy project during the Kuomintang’s reactionary rule, we are here