论文部分内容阅读
根据党委的指示,我们在三月份组织了一支“侦察”小分队,深入到烧结厂石灰石准备间进行摸情况。通过“二访”、“一查”(访问生产厂、访问原施工过的同志;解剖设备,查清“敌情”),我们了解到石灰石准备间是一个五出五进拖了几年悬而未决的老大难工程,这主要表现在“四多”、“一缺”上。“四多”即设备隐患多、安装质量遗留问题多、基础偏差多、设计漏洞、漏项多。“一缺”是缺乏完整的设计技术资料。针对以上问题,我们广泛深入地发动群众,采取集中优势兵力打歼灭战的办法,开展群众性的创样板活动。在施工中,坚持好字当头,严肃认真,共处理
According to the instructions of the party committee, we organized a “reconnaissance” squad in March and went deep into the limestone preparation room of the sintering plant. Through “two visits” and “one investigation” (visiting the factory, accessing the original comrades; dissecting the equipment and finding out the “enemy”), we learned that the limestone preparation room is a five-into-five After a few years of unsolved hard work, this is mainly manifested in “four more” and “one missing”. “More than four” means that there are many hidden dangers in the equipment, many problems in the installation quality, many basic deviations, design loopholes, and many missing items. “A missing” is the lack of complete design and technical information. In response to the above issues, we have launched a wide range of in-depth mobilization of the masses, and we have adopted a method of concentrating superior forces to fight annihilation, and launched mass-creation campaigns. In the construction, we must stick to the word, take it seriously, and handle it together.