鄂南蒲圻市供电局的电网调度自动化系统实用化建设是1987年起步的。以原有的一套DCF——5分站为基础,经过6年的艰苦奋斗,现在已建成WDZ——7+AST386监控及调度管理系统,使全市五个重要厂、站全部投入了远动装置。全市总加完成率(月)达到97%,计算机月平均运行率99.6%,调度自动化系统月平均运行率98.5%,年事故动作正确率98.3%主要考核指标和功能达到了部颁要求。1993年7月12日经电力调度中心、华中电业管理局、省电力工业局、省农电管理局等领导部门检查验收,我局成为华中地区4省第一家“县级调度自动化系统实用化单位”。
The practical construction of the power grid dispatching automation system in the Pu’an City Power Supply Bureau in South Hubei Province started in 1987. Based on the original DCF-five substations, after six years of hard work, the WDZ-7+AST386 monitoring and dispatching management system has now been established, so that all five major plants and stations in the city have been put into remote control. Device. The city’s total completion rate (month) reached 97%, the computer’s monthly average operating rate was 99.6%, the monthly average operating rate of the dispatch automation system was 98.5%, and the annual accuracy rate of accident actions was 98.3%. The main assessment indicators and functions met the ministerial requirements. July 12, 1993 by the power dispatch center, Huazhong Electric Power Bureau, the provincial power industry bureau, the provincial agricultural power management bureau and other leading departments inspected and accepted, the bureau became the first in the four provinces of central China “the county-level dispatch automation system Unit.”