阳泉至五台山高速公路桃河特大桥横跨石太铁路,采用转体施工的主墩高度达40.0m,为满足既有线路的安全防范级别、保证施工安全,对桃河特大桥转体施工技术进行专题研究。一、项目简介该成果以桥梁T型刚构水平转体施工技术为核心,建立了较为系统的T型刚构转体施工技术体系:控制转盘四周水平高差不大于1mm和控制转盘系统水平位置不大于1mm;调整滑道钢板位置,确保滑道平面容许偏差±5mm、滑道平整和圆顺,允许偏差为±1mm、滑道基座水平,3m长度内平整度不大于±1mm和滑道径向对称点高差不大于滑道直径的1/5000(2mm)的安装精
Yangquan to Wutaishan Expressway Taoxi Bridge across the Shi-Tai Railway, the use of swivel construction of the main pier height of 40.0m, in order to meet the existing line of security precautions, to ensure the construction safety of the construction of the Taoxi Bridge Swivel Conduct a special study. I. Project Profile The results of the bridge T-type rigid-frame construction of horizontal rotation as the core, the establishment of a more systematic T-rigid-frame construction technology system: the control dial around the level difference is not more than 1mm and the level of the control dial system Not more than 1mm; adjust the slide plate position, to ensure that the slide plane allowable deviation ± 5mm, slide smooth and round, the allowable deviation of ± 1mm, slide base level, 3m length within the flatness of not more than ± 1mm and the slide Radial symmetry point height difference is not greater than 1/5000 (2mm) of the slideway installation precision