论文部分内容阅读
在翻砂造型的时候,为了增加砂型的强度,一般都要在型面上插钉加固,不然容易产生冲砂、起砂等疵病,从而使铸件报废。据初步估计,每吨铸件需要洋钉2~4公斤,有的高达6公斤。但在目前情况下,洋钉供应困难,我车间老工人根据实际经验,试制成功了铸铁洋钉。这不但解决了困难,更重要的是节约了钢材,降底了成本。现在把具体情况介绍如
In the molding time, in order to increase the strength of the sand, generally have to insert the nail reinforcement in the surface, or prone to red sand, sand and other flaws, so that castings scrapped. According to preliminary estimates, each ton of castings need 2 to 4 kilograms of foreign nails and some up to 6 kilos. However, under the current circumstances, the foreign nail supply difficulties, the old workers in our workshop based on actual experience, the trial success of the cast iron ocean nail. This not only solved the difficulties, but more importantly saved the steel and lowered the cost. Now introduce the specific situation