1、登杆前不核对线路名称和杆号就盲目登杆; 2、登杆前不检查三米划线、杆子埋深及拉线牢固程度,盲目登杆; 3、在杆塔上作业,将安全帽挂在杆塔箍和横担上,或当工具包使用; 4、线路工作挂接地线前不验电; 5、接地线插棒不规范,在60公分处不划印线; 6、个人保安线使用不习惯或不使用,个人保安线当作主接地线使用; 7、工作票未许可,工作人员就进入施工现场登杆或做其他违章的准备; 8、还未等工作人员全部下杆就提前拆除接地线; 9、单人巡线时,发现缺陷,擅自登杆(塔)检查,又不注意安全距离; 10、事故巡线随意接触断落导线或攀登配变台架; 11、工作票所列安全措施到工作现场打折扣,如应挂接地线只做相间短路,甚至不带接地线和验电器到现场; 12、高空作业、砍伐树木、设备清扫、倒闸操作时,应设专人监护而未设; 13、在同杆架设的线路,平行带电的线路上,应设专人监护而未设; 14、高空作业时,地面配合人员及临时工、民工未
1, do not check the line name and pole number on the board before the blind on the board; 2, do not check the three meters before boarding crossed, the depth of the rod and pull the wire firm, blind boarding; 3, work on the tower, will be safe Hat hanging on the tower hoop and cross arm, or when the kit use; 4, the line work before the ground wire is not tested; 5, ground wire rod is not standardized, not marking at 60 cm; 6, personal security The use of the line is not used or not used, the personal security line as the main ground wire to use; 7, the work ticket is not allowed, the staff entered the construction site or do other illegal preparations; 8, To remove the ground wire in advance; 9, single patrol line, found defects, unauthorized access (tower) check, and pay no attention to the safety distance; 10, accidental patrol line random access to the broken wire or climbing with variable gantry; Work tickets listed security measures to the work site discount, such as should be connected to the ground only short-circuit phase, or even without ground wire and electroscope to the scene; 12, aerial work, tree felling, equipment cleaning, closing operation should be set Hand care but not set; 13, set up in the same pole line, The row line energized, without a supervised setting should be set; 14, aerial work, with ground personnel and temporary, non-workers