论文部分内容阅读
本文研究建立在主航道上且在电力系统中担负骨干调峰任务的梯级水电站的最优调峰方式以协调调峰方式引起的非稳定流与航道航运的矛盾,提出了最优控制模型和预估—关联协调混合的梯级计算结构及算法。本文以国内的三峡葛洲坝梯级水电站作为研究对象。
In this paper, the optimal peaking method of cascade hydropower stations built on the main channel with backbone peak shaving in the power system is studied to reconcile the contradiction between unsteady flow and channel navigation caused by peaking. The optimal control model and pre-control Estimation - Correlated and Coordinated Mixed Cascade Computing Structure and Algorithm. In this paper, the Three Gorges Gezhouba cascade hydropower station as the research object.